Section 13 - Hennepin Canal Trail

Grand Illinois Trail picture

The Hennepin Canal was started in 1890 and completed in 1907, when it reduced the distance that goods and people travelled from Chicago to Rock Island by 419 miles. In order to keep up with rail competition and carry more cargo for competitive costs the canal boats needed to exceed the size of the width of the canal; thus, the Hennepin Canal became obsolete.

Grand Illinois Trail Map - Section 13 

(Hennepin Canal Trail / Bridge to Hennepin Canal Trail / Bridge 15A)

Click for Printable PDF Support Documents for Section 13:

Go Direction On Distance (mi)
    Start: Hennepin Canal Trail at bridge 37  
  E Hennepin Canal to bridge 29 (2200 E Rd heads south 2 miles to the village of Atkinson) 8.5
  E Hennepin Canal to bridge 23 (Rte 78 heads south 1 mile to the village of Annawan) 6.1
  E Hennepin Canal to bridge 20 (120 E Rd heads south 1 mile to the village of Mineral) 3.8
  E Hennepin Canal to bridge 15A (Hennepin Canal Trail enter Hennepin Canal Parkway State Park) 7.6
    TOTAL DISTANCE 26.0

E-mail Newsletter

Enter your e-mail address:

Join Openlands On:

 Openlands account on Facebook  Openlands account on Twitter  Openlands account on YouTube  Openlands account on Flickr
 Facebook  Twitter  YouTube  Flickr